Stirring Up The Red. 10th October

Handmade Bakery, Slaithwaite

Sunshine. It was guaranteed to be good weather today as we’d not be working any locks. But the sunshine could be used for other things, painting!

It’s sunny out. Can I go out?

Mick headed off to visit the Co-op and Aldi to see what miracle drugs he could find to help us both with our colds. We’d really like to not be spluttering and sneezing this weekend, but it looks like we’ll have no choice.

Stirring up the red

I dug out the cream and red paints from one of the bow lockers. Masking tape and fine sandpaper from the painting cupboard inside. The pan was lifted off the mushroom vent and dried off, moisture having collected around the rim of the pan. Then sections of the grab rail were taped up that needed top coat. My aim this year had been to repaint the grabrails, but I’ve run out of time to do a proper job. This also seems to be my aim most years! We just get too busy boating.

Once the sections were taped off I gave them all a sand down. The undercoat needed flattening out and the surrounding paint needed to have a key to aid adhesion.

May not look pretty, but it’s got a coat of paint on it!

An old envelope was stuck under the hole of the mushroom vent inside the cabin, to catch any stray blobs of paint. Then a coat of cream was painted. I’d not bothered to mask off an area here, I just tried to keep the area within the size of our biggest pan so it could be covered up again later.

Several shades of red

Then areas on the grab rail had a coat of red. Red no matter what you do fades in sunlight, it’s a fact and you have to live with it. For me to have a boat with no red on it wouldn’t be right as it’s my favourite colour. I’ve touched up the starboard side before with the red that had been noted in our boat bible from Finesse when Oleanna was built. However the number was out by 1 digit so the colour had been quite a bit darker. Now the grabrail looks a bit of a patchwork, one day it will all be the same bright red again.

Second coat of red and blue needed

One area of rust had spread across from the red grabrail onto the blue cabin side, I’ll hopefully follow up with the blue on the next possible day. The red also will require a second coat at some point. I made sure I removed the masking tape after a short while, leaving it on too long means it’s a nightmare to remove.

An exciting five minutes for Tilly

Next job was to dig out my sewing machine from under the dinette. I’d bought myself some red cords which had been sent to the house. They were in the sale and I could only get my size with a longer leg than required. So they needed turning up by 3 inches. Ironed and sewn, job’s a good un.

Sewing

Attention turned to a painting I did recently. This needed trimming and a backing making for it. I’ll hopefully be able to show you what it was and for after the weekend.

Ready to hand over

Next and final job, give Mick a hair cut. It’s not that long since it was last done, but a tidy up would be good. He’s all smart now, we’re ready for the weekend. Just have to hope my nose stops glowing red from being blown so much!

My photo of tonight’s Northern Lights!

0 locks, 0 miles, 1 bottle of cough medicine, 1 box tissues, 2 boxes cold capsules, 1 roof touched up, 1st coat on grabrail, grade 3, 3 inches up, pair 41 finished, 8 more pairs on waiting list! 0 northern lights visible, 2 sniffly coughing boaters, 🙁

Leave a reply and don't forget to tell us who you are