First there was ice. Then too much water. Now it’s a bridge!
Our plans may have to change. We’d been hoping to reach Yorkshire by now, but obviously the River Trent being in flood hasn’t helped that. All part of boating through the winter especially where rivers are concerned. Now as the river levels are dropping, gradually, we’ve been looking further ahead.
Vazon Sliding Bridge had problems in the heat last summer, since then the bridge is opened twice a day to boat traffic at 9am and 1pm, apart from when Network Rail are on strike. If the river hadn’t been in flood we’d have had a days wait before we could pass through.
When Mick had phoned to book passage in at Keadby the Lock Keeper mentioned that Maud’s Swing Bridge was also closed. A date for it to open unknown! Hmm. Here’s a link to the stoppage notice LINK. It has been closed since the 23rd November, the notice hasn’t had an update.
Mick rang C&RT and worked his way though to the right part of the country and got to talk to a lady regarding the bridge. Apparently the bridge was struck by a vehicle back in November causing a lot of damage. It has been taking time for the drivers insurance company to sort things out and as yet the engineers haven’t come up with a method of mending the bridge. So at the moment there is no known date for it to open, it could be months! The lady was trying to get someone to do an update.
Poo bar bum!
A re-think is needed. Options.
- We continue downstream and exit the River Trent at Keadby, then sit and wait for the bridge to open. Not a popular option.
- We head downstream on the Trent and wait for a suitable day to head round Trent Falls. Not a popular route in the winter months.
- We continue downstream and find somewhere to moor that isn’t in Yorkshire, but as close as we can get with good transport links. Maybe.
- We stay put in Shadlow, easy access to transport. Maybe.
- We turn around and once Stenson Lock reopens, with its new gates, we head up the west side of the country to cross the Pennines over into Yorkshire. A lengthy journey especially in winter, juggling it around work, stoppages and weather. Hmmm.
We’ve got some thinking to do. One option is looking the most likely at the moment.
Today I managed to work through the alterations on another pair of overalls. These were size XS, but still needed the arms and legs shortening. One pair left to do. Mick returned from Scarborough with a few bits I’ll be needing for #unit21 in the next few weeks.
0 locks, 0 miles, 2 trains, 1 bus, 1 broken bridge, 1 river coming down, 5 options, 2 pairs overalls finished, 7.5 inches, 5.5 inches, 1 still to do.
Decisions Decisions! Ho hum…