68 hours
Sunday was meant to be a day off to try to recharge the batteries. It started with forwarding lots of reference to Phil who was working at the theatre painting all the 2D dressing for the Boozer. This I didn’t mind as it was a two minute job whilst enjoying a cuppa in bed with Tilly keeping my toes warm. Then the emails started with questions and requests, easier to do straight away than thinking about them all day. Have to say I did get a touch hacked off when asked a question I’d already answered four days earlier!
But there was still time to enjoy a cooked breakfast and a home cooked Sunday roast of Lamb.
With the sun out we walked down to Isis Lock, the level below quite a bit higher than normal. At the junction with the Thames the flow was a lot stronger than the day before, Mick said if it had been like this then he wouldn’t have tried to move the boat. We walked up to Port Meadow along the narrow path and crossed over the foot bridge, a lovely stroll for a Sunday afternoon.
Monday came round a touch too quickly and I was back on the S3 to Chipping Norton, this had to stop and be rebooted as the driver was getting error codes flashing at him. Luckily a five minute break did the trick and we were back on our way.
A new props maker was starting today, Emma, so a hand over was required. Phil was still about for the day finishing off bits which we put in position to see how they looked, which was very good. I did feel my age when I had to explain about pre-decimalisation and £ s d. Poor Phil ended up having to repaint the prices in the boozer twice, the last time with d and not p.
Tuesday saw the return of Chris the carpenter and Gemma, Production Manager. Chris worked his way through a list of jobs that had been kept for him, someone who could cut a straight line in one go is an asset. The evening sessions had meant to have been for the Lighting Designer Mark to plot the lights, but he’d been held up on a show in London, this meant we could get on with jobs in full light and sound levels could be set.
Wednesday and it was time for everything to be put together, actors, costumes, lights, set, props, sound, scene changes. The advantage of the actors rehearsing on stage with the set is that most problems had already been ironed out. There were still notes to take, being able to see the set and props under stage lighting meant there were things to add or alter.
Two long days sitting in the dark, taking notes and then taking advantage of the actors breaks to get on with jobs. I had become known as Pippippinpippippin, as I was a stand in for Pippins in the scene changes. But on Thursday afternoon we were joined by them. This meant going back to the start of the show and teching each team of four into the show in turn. This does become somewhat tedious, but it’s important that each of the three teams knows what they are doing.
On Friday we finished teching the show with the main cast and spent the evening with the Pippins again. They are involved in the show much more than last year and have quite a few complicated songs and dances, so it was decided to postpone the dress rehearsal that normally happens on a Saturday morning and use the time cleaning up dances and scene changes instead.
Interviews for the local radio were recorded, I may get on air you never know.
My lists of jobs are getting shorter. The last couple of evenings I’ve spent trying to sort out the back cloth and portals that suffered so badly with damp in the workshop. Flameproofed sheets of timber are used in the construction of theatre sets, this got damp after I’d finished painting causing the salts to leach through onto the surface, fading colours and leaving a residue. Nothing for it but to repaint large chunks of the main set.
The other job that is taking it’s tole on everyone’s patience is installing LED tape around the portals. This takes time, let’s just say that some people are better at this than others. Staring at a lumpy mess you’ve created behind the tape, then disappearing into the toilet for half an hour doesn’t get the job done, but it does mean someone else ends up doing it!
Yesterday afternoon it looked like the lights were nearly there, the final strip just needed connecting before we left for the weekend. But three LED’s decided that they no longer wanted to play the game and stayed pink whilst those around them changed colour. Nothing for it but to start again on that half of the portal.
I managed to catch a bus back to Oxford at a reasonable time, the bus having to wade through water. My walk along the towpath back to Oleanna felt very narrow with the water on the mill stream higher than it had been last weekend. I was glad of a touch more land between the canal and the flowing water when I reached the boat.
Tilly was very happy to see me, Mick having left first thing to head up to Liverpool for the weekend. Of course she missed me. But I also missed having my morning Ding Ding that Tom had forgotten!
I encouraged the stove to flame back into life, fed Tilly and then myself. Chicken pasta with a few glasses of wine. Mick had been to London this week to pick up post. So now I have my new passport several months after it was applied for (it arrived three days after I applied for it), a new credit card, new E111 card, a waitrose card we’ve been waiting for since we moored in Newark a few years ago. We also have a new pair of boating shoes each and Mick has a second replacement pair of sheepskin slippers. What a lot of post!
Tilly chose what we were going to watch, somehow I don’t think she expected The Rock to be about chemical warheads on Alcatraz, a touch disappointing as there was little climbing involved, but I didn’t mind as it had Sean Connery in it. Not quite the girls night in I thought we’d have.
2 buses, 1 chippy, 1 painter, 1 new props maker, 0.5 backdrop repainted, 3 dogless collars, 3rd attempt with the LEDs, 12 Pippins, 2 pairs ears, 1 very dark room, 1 girls night in, 1st pasta in three weeks.
Nice Breakfast, boots is looking fab well done on that..
Cheers
Ade
Thanks Ade