Call That A Pontoon! Breach 18

Tilly is getting more and more demanding to go for walks, it is getting so I can’t actually do any work until we’ve been to have a look at the trees. I have tried suggesting she takes up a hobby, something like macramé, but she’s not too keen on that idea. Any how, when we returned I decided to have an early lunch and check the world of social media, up popped a link to new drone footage from the breach site. Thank you Mark.

It looks like there has been quite a bit of activity.

The roadway that had been laid across the field from the base has been extended onto the towpath. Here a pile of aggregate has been added into the side of the canal along with a mound of clay. Could this be where they plan on building one of the dams? Or are they just widening the towpath?

The roadway and footpath from the site base compound

A footpath has also been laid next to the roadway. A digger looked like it was reinforcing the access over a drain by the road. Are these extra roadway sections lying in the field by the roadway? Or are they piles waiting to build the coffer dams?

On the other side of the canal new hard core has also gone down. Presumably the track to where the pumps are helping to keep the level in the drain down, was getting far too muddy. An area has also been covered with hardcore on this side, possibly for machinery when they start to build the dams. A digger was busy, maybe dredging the edge where one of the dams will cross to.

Pegs around the faded grass to the left

Looking at the area where the breach is, where there was/is a small hole through the grass, marker pegs can be seen. This suggests the area around the hole is unstable.

Less of the blue tarp showing above the water

Comparing Marks photos from about two weeks ago to todays it looks like the canal level is up by just a bit. A bag of aggregate and the blue tarp seem to be sat a little lower in the water than they were before.

Now that is one big pontoon

C&RT in their update had mentioned pontoons that they were setting up and sailing down to site. Now there are pontoons, and then there are huge PONTOONS. This is one of the latter. It looks like there are two large poles (for want of a better term) lying on the top of the sections. These are likely to be lowered through a couple of holes in the pontoon and used to anchor it in position. Back in September we saw a similar pontoon being used near Doncaster.

Mark was informed this morning that the piling for the dams will start to go in over the next couple of weeks, then the area between the dams will be dewatered towards the end of February, weather permitting.

Thank you again Mark for the use of your photos.

Getting Ready, Breach 15. 17th January

In Fridays Boaters Update from C&RT, there was a section regarding the breach on the Aire and Calder, nothing new was mentioned but good that it got it’s own section between Coronavirus and the £10 million they are spending on the Yorkshire Waterways this winter. I suspect quite a chunk of that money will be going towards work on the Calder and Hebble at The Figure of Three Locks that were badly damaged in last February’s storms.

She’s still there. Thank you Al

A photo came through of Oleanna on Friday afternoon from Lisa. Levels still low in the marina, but stable. It looked grey down in Goole and the marina might even have been a touch icy still.

The North Bay, not looking as busy as it felt

Today Mick and I attempted to have a walk to the North Bay in Scarborough, we knew it would be busy as it was a nice day but hadn’t expected so many people in Peasholm Park, so we ended up doing a detour up onto Northstead Manor Drive.

Green Tor

Here very large houses sit above the park, one took our fancy straight away. Green Tor shows off it’s 1930’s credentials with green roof tiles, long stained glass window up the staircase. We had a peak in through the windows as we knew it would be empty being a holiday let. A look on the website shows the owners love of wallpaper. Huge rooms, well they would have to be as the house can sleep 14. It also has a hot tub and the garage has been converted into a games room and cinema!

We meandered down to the beach via the Open Air Theatre. It’s been quite a few years since we’ve walked through here. The lake that used to separate the stage from the audience has been concreted in. Concerts are being advertised, the first being Crowded House on the 8th June! Here’s hoping the season of open air concerts will be able to go ahead this year.

The North Bay chalets and us

My camera was out as normal, but today I was wanting to get some inspiration for a project I’ve been asked to be part of. The North Bay beach chalets caught my eye, as did many other things. We stayed close to the chalets avoiding the crowds on the main footpath and beach, then headed up the cliff towards my old street and a walk back home through town. A lovely walk on a lovely day, just a shame there were so many people about. My suggestion to Mick of getting up early and going for a walk before everyone else didn’t go down too well!

Aire and Calder Breach Site

The weather had also been good in Goole today. Mark Penn had been out with his drone taking photos of new housing, the Siemens Site and of course the breach site on the canal.

Boulders and earth filling the hole

More boulders and earth have been put at the end of the concrete section filling the hole that had appeared after Christmas.

Holes

There are a couple of square holes. One on the concrete above the culvert , this is covered and fenced off, then the other just to one side in a grassed area. They are almost certainly inspection holes to try to see what is below.

Base for the works

Another photo shows that the corner of a nearby field has been levelled off and hard core laid. A Site Office sits to one side and is kept company by a digger and dumper truck, this will obviously be the base for the works when they start.

River Don running parallel to the Aire and Calder

A longer shot across to the other side of the cut shows the pumps which are drawing the water away and into the River Don. You can see the cloudy water joining the darker waters. The whole area is water logged right now due to the amount of rain recently.

Thank you Mark for letting me use your photos again. It’ll be interesting to see the works from above when they start.

0 locks, 0 miles, 1.5 layers of wallpaper up, 2 windows, 1 doorway, 1 electric saw, 1 internal tree, 1 carpenters opinion sought, 1 day of rest, 1 router on order, 3 weeks, 20 x 20, 5.5 miles, 1 bored cat, 2 many people, 1 portacabin, 2 holes, 4C, 100% charged batteries, 1 roast chicken tonight, 1 Happy Birthday!