Aire and Calder Navigation
In the mornings I open up the back of the boat, slide the stern hatch open, then Tilly can go when ever she wants, I still need to open the door or side hatch to let her in. This can be annoying, but it’s far far better than having to try to catch a rodent friend scurrying around the boat! This morning was no different and she’d been out for a while then come back in for a snooze. WE then heard a scurrying on the stern deck!


Pirates!!! We’d been borded!!! Were they still on board? Their paw prints required a good amount of sniffing for identity. Bigger than mine. A WOOFER Pirate! The smell made my lips curl. Eurgh!!!

I made arches and barrels for the walkdown scene, the tip of my poor index finger is now really quite sore, but the end was in sight. After lunch I popped everything into the model box. My barrels were far too small, pethetic really. Time to remake them that bit higher.

In Scarborough the lean to was coming along well. All but one pane of glass was in. Neat flashing around a soil pipe, bits of timber at joins. What would we like where the pitch of the roof had been altered on the inside? Mick had made the right decision, wood. Un-surprisingly the roofer had messaged saying he’d be round tomorrow. Is that the tomorrow that never comes?! I’d put photos of the lean to here, but the internet is abismal!

Wednesday. When I finished work last night and popped the new barrels in the model box I hadn’t achieved my goal for the day sadly, but I was also disappointed that my new barrels were now too big! Barrels take a lot of making at 1:25 and I seem to make them for every panto at Chippy. Maybe there was a different solution, thankfully there was and a mixture of the two sizes of barrel did the trick. Hooray!!!

All of a sudden there was a smell. Oh Blimey that was rank!!! What was it? Where was it coming from?

Was it the sewage works that sit behind Lemonroyd Marina? I went outside, there was a vague aroma there, back inside it was stronger and not quite the same as the sewage works. I walked round, far stronger around the galley and dinette. Maybe our starter battery, although new, was gasing?! Tilly was closed inside, I lifted the engine board, all was fine in there. Just where was it coming from?

Inside it still stank! Do Lithiums make a smell? I opened up The Shed cupboard, nope it just smelt of life jackets and gloves. I turned to ask Tilly what she thought it might be……my lips curled. Oh Barry Gibb! It’s YOU!!!!!!!!!!

A closer sniff made my eyes water! What on earth?! Her paws were a touch grey, had she found a hole to go down that was inhabited by a musky stinky creature? That was the only explanation I could come up with. What a Stinkerooni!!! I avoided beng close to the stinky one for the remainder of the day, she was constantly having a bath, but didn’t seem to be too perturbd by the stink.

In the afternoon I ran through panto scene by scene. Checking positioning of things. Did I need more sliders? Would that look better a bit more upstage? Was more room required for that scene? A list of notes to work through.
An email about the white card model meeting arrived. What time and where? I was now able to book my train tickets, a touch of flexibility required but having 5 return tickets splitting the journey up instead of the one saved over £100. Now with a definate deadline I was spurred on to tick things off my notes list and worked on to midnight.

Back in Scarborough, guess what? The roofer promises he will be round tomorrow! But the lean-to was now completed. They had said it would take three days and it had. They’d even tidied up and helped Mick move the extra fridge back in along with Tilly’s tree back into the corner. Rain is forecast so we’ll see if it’s water tight.

By bedtime Tilly wasn’t quite so stinky anymore, but I really didn’t want to share the bed with her!
0 locks, 0 miles, 4.58 miles walked, 81 minutes briskly, 1 Bee Gee on a post, 3rd time lucky with barrels, 1 cocker pirate, 1 sheet of notes, 1 lean to, 36 hours to sink, 1 tree back where it should be, 1 absent roofer, 1 definate leak, 5 return tickets, 1 extreamly STINKY cat!