Key Of Power Locks. 19th October

Above Fall Ing Lock to Castleford Moorings, Aire and Calder Navigation

Yesterday Mick had checked the stoppage notices again for our route eastwards. The flood locks were in use on the Aire and Calder, all were user operable apart from Ferrybridge. Ferrybridge is the last lock off of a river section that we need to pass through. We wondered why it wasn’t user operable, he made a call to CRT. The answer came back that due to Health and Safety it wouldn’t be possible for us to use the lock, we’d only be able to go through once the river level was back in the green and the flood lock opened to boats.

Waiting above Fall Ing Lock

Mick walked round to the garage for a newspaper, but none was to be bought, no newspapers at all. So nothing for it but to head onwards. We decided to make a move up to Stanley Ferry sooner rather than later, just in case the river responded to last nights rain, we’d rather be stuck somewhere where we could let Tilly out. Someone else had had a similar idea, NB Perseverance had whizzed past heading up stream in the rain whilst we were still getting up.

Going down

We were on our way before breakfast, topping up the huge Fall Ing Lock. This being our last manual lock for 2024 I was determined to operate it. The bottom gates are heavy, but not too bad if you are patient. I lifted the paddles and watched as the water washed up over the river level board pushing it into the red from amber.

The river seemed pretty normal to us as we made our way towards Stanley Ferry. Here the flood lock was in use, I climbed off with the key of power to operate it. At first it didn’t respond to any buttons being pressed, Mick had a go too, the top sluices needed reminding they existed, now I could open the gates. Unlike at the beginning of the year there was a difference in height, maybe 9 inches.

Key of Power from now on

A boat was coming towards us, I waited to close the gates behind them and retrieve my key. This was NB Ampere an early electric boat that we’d seen at our first Crick boat show. There was time to chat to the crew as the boats swapped positions and the gates closed behind them, they’d been stuck above Lemonroyd when the rivers came up.

NB Ampere dropping off crew

The only space we could find with rings was at one end of the water point, we tucked in, leaving space for another boat. Time for breakfast a bacon butty each. Then as the port side was to the bank we emptied the yellow water tank. The connector that screws into the outlet seems to be loosing it’s thread. Some PTFE tape was wrapped round the connector hoping this would stop any leakage. It was an improvement, but will require a replacement over winter. We moved up to the services to use the elsan, then I swung the bridge open a CRT fundraiser being very jolly saying hello to everyone who came past, but not managing to engage further.

Across

Across the aqueduct and past the Stanley Ferry CRT workshop. Earlier in the year there had only been a couple of new gates awaiting fitting. Today the whole of the area was filled with lock gates. Tried to count how many pairs there were, I think around twenty, that’s a LOT of oak!

New gates, lots of them

The sun was coming out now, anglers lined the banks as we dropped down Birkwood, Kings Road Locks. Under the M62 and on to Woodnook Lock where we’d drop down onto the river again. Big and wide we headed to Castleford Junction and the sad houses.

Mick opted to wind to face upstream to drop me off, just in case the flow from the River Aire wanted to assist us towards the weir. I took my time up the steps, wanting to avoid slipping as I’d done back in March. Here the river level was still just in the amber. I opened the gates and waved to Mick to come round from the lock landing. As he approached I could see how much current there was as the stern of Oleanna was being encouraged towards the weir. The level of the huge lock had to drop by about a foot, so took some time to level out to the cut.

Castleford Junction

Now we had to decide what to do. Should we continue onwards and see if Ferrybridge Flood Lock was actually not useable? If that was the case then we’d have to return to Castleford to be able to moor. Sunday’s weather had looked bad on the forecast and might bring the river back into the red. Being close to a station on Monday was a necessity, both Castleford and Knottingley would work. We opted to not risk having to return and pulled in towards Bulholme Lock. Here we hoped we’d not be plagued by the permanent moorers running their generators well into the night.

Tilly was awarded three hours shore leave. Not her favourite mooring, but far better than being cooped up in Wakefield.

They were here in March

As the afternoon went on several boats came past, one from the lock ahead of us. Had they come from Ferrybridge? Were the other boats headed that way carrying on or mooring up. Surely the light at the lock should be red if Ferrybridge Lock was inoperable! It was amber, and unless you looked at the stoppage notice you’d not know anything about the health and safety issue. Hmmm!

6 locks, 1 of them a flood lock, 7.9 miles, 2 bacon butties, 1 empty wee tank, 0 manual locks left, 1 key of power, 3 hours shore leave, 2 many boats moving for it not to be open.

https://maps.app.goo.gl/GTNwv1MrmtTzx3zr6

Leave a reply and don't forget to tell us who you are