Doncaster Visitor moorings to the site of Small Hedge Swing Bridge, New Junction Canal
Some blueberries were required before pushing off, so Mick headed to the market to see what he could find. I tried calling Peter at Prompt Side so that we could talk through setting up and saving images for print. But he was busy setting up the days printing jobs, he’d ring back.
Mick topped us up with water, NB Northumbria arrived with Alfie on the roof, time for another chat before we pushed off.
Pushing off shouldn’t really be a problem, except the weed boats were back, three of them today. Two caterpillar boats and one conveyor boat. They were collecting pennywort from around the moorings to deposit on the opposite bank. Happily going back and forth without any thought that other boats might be moving. Eventually we managed to catch a gap and sped off.
The moorings above Long Sandall Lock were empty, a rare sight, sadly we weren’t wanting to stop here today. The lock had just been filled for a boat coming up, the top gates opened and the two boats swapped places, perfect timing. Back down the lock and onwards to Barnby Dun.
Only 16 held up at the bridge today.
Now it was decision time. Should we moor back at Bramwith Junction? Or should we carry on onto the New Junction Canal? Flood locks on the Aire and Calder were closed yesterday so rivers were on the rise. It would be a real pain to be held up on the wrong side of the Don Doors if they had to be closed due to rising levels. We’d cross and then find a mooring as soon as we could. Well that was the plan.
At the junction we waved to David and Clive. Les from NB Christopher B is expecting an operation later this week and will be kept in hospital until she is mobile. The River Don looked higher than normal, but still a difference between it and the canal. Maybe we were being over cautious.
Nowhere to moor, we’d have to carry on. Perhaps just off the end of a bridge landing? No, it was too close to the road for Tilly to be allowed freedom. Onwards, a flag on my map looking like it was the only possible place to moor before Sykehouse Lock.
Low Lane Swing Bridge swung, Top Lane Lift Bridge lifted, only problem was I couldn’t open the gate to get out! I had to climb the fencing. Kirk House Green Lift Bridge took a lot of jiggling for my key to turn to power it up, but soon we were on our way.
The light at the lock was red, a volunteer on duty. We’d already come farther than we’d really wanted to, but just after the narrowing where a swing bridge had once been we saw our opportunity a bar on the piling suitable for chains.
Time for Tilly to head back out and explore. Yesterday was her eighth birthday, but it was no fun for a cat being cooped up in Doncaster, so today we needed a mooring for her and her postponed birthday. Hooray!!! Lots of friendy cover, no woofers, no nobody, BRILLIANT!!!!
A treat cheese lunch was enjoyed, hairs were removed from the songsheet artwork that I’d forgotten, then it was emailed off for approval by John. I took a couple more windows out and gave them the full clean before needing to sit down again.
The perfect mooring for a cat, but phone signal nearly non existent, no good for my photoshop phone call. The internet was also slow, apart from when watching a film. Stronger (2017) is based on the true story of Jeff Bauman who lost both his legs in the Boston Marathon Bombing. Mick was astounded at the amount of swearing it contained, what would our parents have thought! Have to admit to giving up with twenty minutes to go when Jeff and his girlfriend started to have a very loud argument after she’d told him she was pregnant. I’ll watch the rest another time, I’d just had enough of them shouting at each other.
1 lock, 8.8 miles, 1 left, 3 bridges, 19 held up, 2 more windows, 3 weed boats, 1 plumber contacted, 1 scaffolder contacted, 4 hours of birthday frolics, 8 years old! plus 1 day, 1 heel turned, 1 very shouty film, 1 stove lit.