Grindley Brook to Stonely Green Bridge 10
The water gauge was showing half a tank this morning so just in case we ended up sitting around a while longer waiting for the bridge ahead to open we decided to visit ABC boat hire at Wrenbury Mill to top up. The forecast was for rain this morning, but it would stop between 11 and 12 midday, so when the rain had stopped for a while we pushed off and headed to the lift bridge. As I turned the key of power in the panel it started to drizzle, then rain, then drizzle, good job we’d put on our waterproofs. Four cars and a dog walker held up, Mick swung Oleanna into the gap between boats moored up at the Mill.
The hire base was busy, a delivery of new mattresses was being moved on board the boats. For the use of their tap we’d been quoted £3 but when it came to ringing it into the till it said £2, £2 well spent for peace of mind.
We reversed out managing not to leave any marks on the newly blacked hire boat we’d breasted up to, then we turned towards the last lift bridge of the Llangollen Canal. Once through we waved goodbye to Wrenbury. Our aim for today was a 48hr mooring just before the closed bridge, from here we’d hopefully be first through once it opened.
In places the water table was higher in the fields alongside the canal than it was in it. Plenty of rain had fallen overnight, today in parts you would need water wings to walk the towpath!
All three locks lay empty before us, but all the paddles are easy on this canal, so it didn’t take much effort to fill them for us to go down. As we waited for the final one to fill I could see a gang of high vis heading in our direction. Nine or ten chaps were walking the towpath heading towards the closed bridge. Could it be that they had had a lunch break and were heading back to carry on with repairs? If so then they certainly were throwing men at the job. Or could it be that this was the clear up team? The works were complete and they were here, mob handed to remove the pumps and damns. We pootled along behind them and pulled in to tie up.





Pushing on a short distance further, we pulled in just before Stoneley Locks and retired inside for a very late lunch. There is a ten hour cruise ahead of us to reach Chester, so we should be able to meet up with our friend Sue and have a drink with Bridget and Storm too. Perfect. Thank you C&RT.
3 locks, 3.73 miles, 2 lift bridges, 4 held up, £2 water charge, 1 quagmire, 10 yellow and orange clad chaps, 0 damn, 4 work boats, +15 lengths of giant pipe, 3 minutes before it opened, 2 days ahead, 4 seriously muddy paws, 1 chimney sweep tail.
Swanley Locks? We had two wonderful months moored above Swanley Top lock on NB Kelly Louise whilst we went through the process of gaining possession of Waiouru from that builder