River’s Coming Up. 29th June

Naburn to the over hanging tree New Walk, York

Sunny day in Naburn

With temperatures set to rise over the next couple of days we needed to find a shady spot, we knew where to head. Tilly had some shore leave whilst we talked to Kath and Sean on the Geraghty weekly zoom. Hygenists, NHS and noisy boats were todays topics. Kenny the Lock Keeper was out mowing the grass at the top of the bank and the river bus arrived to pick up passenegers from the campsite, it was all quite busy for a while and I did wonder if Tilly might have ventured further away. But when I went out to call for her she appeared from behind the hedge and came running straight away, a good if noisy morning.

As we moved up to the water point we could see that the river had come up, no longer a step up onto the bank and across they way the timber on the side of the cut was at least half submerged.

New hose with some old hose

The new hose was reeled out and given a thorough flushing through before it started to fill our tank. Kenny came over to confirm the time of our departure in a few days time. Topped we were on our way back into town. I got on with work, pausing to wave to my family home and Philli’s boat as we passed. At New Walk Mick was pulling in, time to help.

He’d pulled up a little further along, hoping to put more space between us and the cruiser Orchid that was moored by Millenium Bridge. But the tree we were under was a willow, they have a tendancy to crack in the heat and the over hanging branches wouldn’t give us quite the shade we were after, so we pulled back to where we’d been last time. Here we could see how much the river had come up, the eyes that we’ve been using to tie to were half submerged. We needed to check the levels!

0.56m at 2pm

Viking Recorder gauge was on the rise. I tried to remember how high the river had to be before the bank started to go under water (a calculation I’d made when we were here in 2020), I think it was 0.9m. The prediction was close to that, we might require wellies.

So where was all this water coming from? It’s not rained in York. Well the catchment area for the River Ouse is up in the Yorkshire Dales where it must have been raining a couple of days ago, too much for the land to just soak it straight up.

I worked away the afternoon as the sun came out and heated up the world around us. We noticed on the Strawberry Fools group that Brian and Jo after the Wash crossing had headed home to York for a few weeks, but when they return to NB That’s It they were planning on heading onto the Middle Level. I sent Jo a message asking if they’d like to borrow our Middle Level windlass and key, saving them £23 for a windlass they’d use once maybe twice. I gave them our location and how long we’d be here for.

The first blue lining, the rest will wait for a canal mooring

As the afternoon continued the river carried on rising, the rings now below the water level. This is why on a river you should always tie off back to your boat, so you still have access to them to slacken them. We hoped someone would loosen the ropes on the cruiser down in Naburn that had been left last night.

Brian’s voice could be heard on the bank, they’d come to pick up the windlass. Lots of tales of the Fund Britain’s Waterways flotilla cruise southwards from where we left them, the Thames, upper and lower, then the Wash crossing. They’ll be making their way back northwards in about a months time after bagging another silver propellor location, well that’s if one of the locks on the River Nene reopens before then! If it doesn’t there will be quite a few boats doing the reverse journey across the Wash.

Just you be careful out there!

As we stood chatting the big loitering cruiser came past, Orchid had gone past earlier. The chap shouted from his cabin ‘The river’s coming up!’ Yes we did know and were keeping an eye on levels along with predicted levels. Predictions were around 0.9m still over 2ft below where there’d be danger of Oleanna coming over the bank.

During the evening we kept an eye on our ropes, slackening them off quite a bit. Gradually the river looked as if it was peaking and upstream levels were starting to fall. We know what the river in York can do, I grew up watching it rise and fall flooding the land infront of our house several times a year, it’s not unusual in York. If the predicted level was going to be much higher or for a prolonged period we’d have headed back to Naburn as we did in 2020. The noisy boats were more than likely heading to the end of Marygate where the bank is higher and they could tie off to mooring rings.

By the time we went to bed the river had peaked and the bank hadn’t gone under water, no need to dig the wellies out and we’d have our shady mooring for tomorrow.

0 locks, 4.9 miles, 1 wind, 1 full water tank, 1 booking confirmed, 2 waves, 1 very shady tree, 1 river rising, 55cm in 24 hours, 10pm peek, 0.81 meters, 1 windlass and key, 1st blue lining ready for florestry.

https://what3words.com/output.jazzy.choice

Leave a reply and don't forget to tell us who you are