King’s Marina to Hazelford Lock, River Trent
Tuesday
Our Sainsbury’s delivery arrived and Mick was up by the gates waiting to let the driver in. Shopping stowed. A new gas bottle was needed to bring our supplies up to winter levels, £54.58, ouch, that hurt! You can tell we’ve not been boating for a while. Yellow water emptied, fresh water tank topped up.

I then had a phone call from Social Services in North Yorkshire, Frank had given permission for them to talk to me about arrangements at the house. I talked her through our hoped for plan, the cleaner the main part, other small jobs and some added bonus jobs that hopefully the Frankness group in Scarborough would be able to achieve this week. With everything being co-ordinated through HQ here onboard Oleanna. She suggested a day for Frank to head home, I suggested a day earlier, this would mean he would be able to go to see the new Ayckbourn play before it closes on in Scarborough on Saturday night. The social worker agreed and went off to carry on making arrangements.
We were now ready. Oleanna reversed out from the pontoon, winded and turned right, upstream, and back out onto the river. Mick radioed ahead, would there be a Lockie on duty today, no answer came and soon an amber light came into view, self service time.

I hopped off and went ahead to work the lock, key of power (before you ask Brian, yes, my phone number is on the floats!) in the pedestal, panel open the lady began her warning ‘Please keep clear of the lock gate area’, over and over again. We were soon up and on our way.

Currently we have three different routes in mind with the aim of getting close enough for me to commute to work on panto. Only one of them is currently open and it’s quite a long way round. Fingers crossed that stoppages open up and a more direct route can be followed. Our cruising plans all involve the Trent and Mersey, but once we reach Fradley we’ll need to commit to a route. I added in another variable to the equation, a possible visit to Urban Moorings to make a deposit of our deposits. Do they still accept passing boaters deposits? If they do it will mean our deposit capacity can be reset onboard and avoid having to make a visit to Scarborough in the next couple of months.

There were messages flying around on the Frankness Whatsapp group. Jobs being ticked off the list, a recently recruited member Chris was charged with drilling and motor jobs. It’s a good job we all worked at the theatre and each of us has our own skills we can draw on. Long conversations with Ben, he’d been to see Frank in the hospital and had been given a few more tasks. So much for a week off from work!

Soon we arrived at Hazelford Lock, the moorings empty, we pulled in to our regular spot, tied up, noted w3w location and Tilly was allowed out. The Lockie came to say hello, he’d been strimming and would soon follow with a leaf blower, How very inconsiderate of him! Tomorrow there’d be no Lock Keepers on the river.

We had a late lunch, then I joined an HMRC Webinar to do with expenses whilst renting out property. I really know how to live! More jobs for Frank followed, questions were asked, the answers not firm enough, I’d need to be a detective again.
Wednesday, a very good day.
Hazelford Lock to Stoke Lock
Tilly was given an hours shore leave before we set off. However, the light at the lock had been on red all night and still was. We checked for CRT notices, nothing mentioned about a closure there. We got the boat ready to set off, then went up to have a look, would our key work on the panel even though the light was red?

There were a couple of CRT chaps there, the lock hut open. We chatted to one of them , it might be that the light had been left on by mistake, it might be that there was a problem that they hadn’t been able to see, they were here to do another job, but had called it in. If there was a problem they’d come and let us know, but we should keep an eye open should the light turn amber. We headed back some Frank detective work done to fill the time.

After a while I popped my head out the front, Amber, we were good to go. I helped Mick untie Oleanna before heading up to the lock to set things in motion. With only one downstream paddle in operation it took forever to empty the lock.

What a glorious day, blue skies and on our favourite stretch of the river. More plans were coming together back in Scarborough, logistics of a theatre trip being put into action. Nurses on the ward were made aware of how important this show was to Frank and they were on board should Frank not be discharged in time, so an escape plan was put together for him.

As we approached Gunthorpe Lock I headed to the bow to be able to hop off, it’s far easier this way as the lock landing has strong currents from the weir. But then up at the lock someone waved at us, there was a group of volunteers doing gardening, some of them trained as Lockies, they penned us up.
Time for lunch, so we pulled in on the empty pontoon. The river is SO quiet!
I opted to walk on to Stoke Lock, there is one bend of the river you can miss out by following a bridleway and if I left Mick to push off by himself I might just be able to keep in front of Oleanna.

The last time I was in the car park by the moorings I was climbing into an ambulance after loosing the tip of my little finger, today the sun made it feel better and I strode onwards through the trees, under the road bridge and headed upstream.

As the footpath rejoined the riverbank, I glanced over my shoulder, I could just make out Oleanna rounding the bend I’d missed out, what sort of pace was I achieving? What speed was Oleanna doing on the river? Gradually Oleanna gained on me, Mick cut back the revs, my 3.5 mph average was pretty good, but on the river Oleanna could do more.

I penned Oleanna up the lock, then Mick headed on to see if the low wall mooring was available. One narrowboat was moored in the lock cut, did they not know about the pontoon? Or were all the moorings full? Only one boat on the pontoon and the low wall was free. We pulled in, gave Tilly several hours shore leave. I showed her the trees at the top of the stairs which of course she was interested in, so I left her to it. However, I’d vanished out of sight, so she came back to the boat SHOUTING for me!

During the afternoon, Frank did his best to answer more questions, the Frankness group was busy, would anyone know one person who could save us six weeks of waiting? Possibly, a couple of emails were sent. CRT emails coming in were good. One saying that the South Stratford Canal would be reopening this week. This meant we’d be able to take a more direct route to panto. Fantastic! We just need to decide where to moor now.
The day had been good, well apart from an email I’d really hoped not to recieve about the print for panto. A proof came through for the portals, it wasn’t the correct size. The print wouldn’t match once the portals were put together? Did I have the original artwork? After painting them, my model pieces had become a little bit wonky. So I’d trimmed the height to be correct, but left the sides so there was space for someone with better knowledge to straighten things out. Add into the mix an extra 15cm all the way round to be able to fix the canvas onto existing flats (scenery), maybe this was what had gone wrong. Maybe not all the information had been passed on?
I learnt how to straighten up the legs, did a mockup, and was convinced I’d got the size of things correct. It would take more work tomorrow, but hopefully that would sort it all out. I sent the mock up to the print company, they passed it on. Fingers crossed.
18.4 miles, 4 locks, 2 moorings, 1 giant courgette, 4 boxes wine, 13kg gas, 1 ex carpenter/maintenance added to the team, 2 many messages, 1 panto email, 2 hours to find a new process, 2 and -2, 1 plan to be implemented, 1 back up plan just incase, 2 favourite moorings, 2 pairs of wonky legs straightened, 1 good day, 1 Mrs Tilly stamp of approval.

