Tipton Medical Centre to Off Side mooring Wolverhampton
Ice!!! That hadn’t been factored into the plan for today!
The alarm had been set, a full days cruise ahead of us, but we woke to Coots ice skating outside the boat. After breakfast Mick went to see how thick it was with a boat hook, too thick. Oh well, stand down everyone.
One job today was buying filters for the next engine service. So instead of picking them up as we cruised past Oxley Marine, Mick caught a train then a bus down to Autherley Junction just in case the boatyard there is closed tomorrow. The chaps said that they were always there and furnished Mick with all he wanted before returning back up to the Wolverhampton Level.
Not only did he return with filters but with news that at 132ft lower there was no ice, there was also no ice in Wolverhampton. By now the sun had worked it’s magic and melted the ice in Tipton too.
So after lunch we pushed off to get ourselves to the top of the locks ready for the morning. With a bit more time on our hands than originally planned we were disappointed that it was too late on a Friday to turn down the Bradley Arm. The C&RT Bradley Workshops are at the end there and needs to be open to provide enough room to wind, Fridays they knock off at 3pm, we wouldn’t get there in time. So that is one thing left on the list for next time.
The sun was out, warming everything. Bright blue skies, such a shame not to make the most of it going down the locks, but that’s boating for you.
Coseley Tunnel dripped at the northern end, buildings were being built. We tried to remember what this stretch was like when we first did it on NB Winding Down. Far more derelict factories and warehouses then.
At Horseley Fields Junction we looked out for the old entrance to what is now Urban Moorings, a bricked up archway must have been where it was. The service mooring visible as we came past the junction, no need to do any washing today so we would cope with the ringroad noise for a night.
0 locks, 5.31 miles, 2lefts, 1 straight, 2 ice skaters, 2 oil filters, 1 fuel filter, 1 air filter, 2 buses, 2 trains, 1 sunny day, 1 pumpout tank taking root, 2 dabchicks, 1 sour dough starter ready for use, 1 more night on the plateau.
Day 8.
One starter bubbling away waiting to be fed. The discard jar is now full. Bread and pancakes this weekend me thinks.
The warning about winding at Bradley Workshops is there as on rare occasions, when there are lots of workboats there, they may have to move them around a little to unblock the winding point – that probably only happens one day every five years so you could almost certainly winded there, especially as your 58′ boat won’t need the full width to wind.