Just tucked up in bed, reading, my phone rang, Vazon Bridge! This was it the call we’d been waiting for!
Bottom half of pyjamas replaced by trousers, socks shoes, maybe even a jumper, it should be a touch chilly out! I’d said to Nick or was it Neil the Signal Keeper we’d be ten fifteen minutes, but I think we were closer to four. Covers were being rolled up and dropped in the dark, extra care stepping on and off the boat, we’d had a couple of glasses of wine.
Across the way the crews from the four cruisers hurried from the back boat, a boozy evening had been being had. They didn’t have quite so much to prepare as us. The chap on NB Phoenix Lady was making ready too. I had a key of power, but was beaten to the manual bridge by a lady from the cruisers. By now the sirens from the bridge were sounding and the big railway bridge was sliding out of the way. A boat headlight could be seen making it’s way towards us. I shouted across to the lady at the bridge, there would be at least three boats coming through maybe five or six. She relayed this to the skippers who were starting to push off, they pulled themselves back in as the first boat came through.

I pushed the bow out, but being so close to the bridge structure it needed some help, a blast of bow thruster to get us round. I called back to Mick that we needed more, only to be told the bow thruster fuse had blown. A little patience for the bow to fully come round and we were on our way the lead eastbound boat.

It must have been a good long window between trains, Nick/Neil peered over the top of his control panel as we came through. There may have been light at the bridge, but once through we were glaring into the dark, headlight and nav lights lit, but still. By the way it’s the first time we’ve had chance to use our new tunnel light, it worked.

I stayed at the bow, close to the pointy end and relayed what I could see back to Mick. The glint of two eyes on the towpath, they blinked at the bright lights coming towards them, then turned and ran off along the path, a fox maybe, too big for a cat.

There’s the big signs about overhead cables. There’s the spillway with a white sign next to it, Mick could just make this out. Did we want to pull in at this end of the moorings? Yes. We slowed our pace, then stepped off cautiously. Looking behind us the following boats followed suit despite there being a big gap in front of us. One boat came round and pulled in further ahead, the others opting to bang spikes in behind on the grassy bank.
I walked down to see if there was any sign of life on NB Delhi or NB Python, all silent, tucked up for the night. Their last post of the day saying how they’d be up early hoping the temperature would be in their favour. No point in tapping on the cabin side.

The chap on the cruiser in front of us said they’d not been expecting the call so soon. They’d heard that there had been a power failure at the bridge, and that there had been some doubt as to whether the back up generators would have enough umph to move the bridge. The crews had moved onto the Rum and Brandy! Four boats out for two weeks from Great Heck on a pub crawl to Nottingham, if they make it that far!
Time to tuck ourselves back up in bed. The excitement of getting through the bridge needed to wain. Three nights of waiting and now we are through, we can now say that we’re southbound! Here’s hoping there’s enough water to keep us heading in that direction!
0 locks, 0.5 miles, 1 bridge swung, 1 bridge slid, 3 westbound boats, 6 east bound boats, 2 dormant boats, 15 crew in the dark, 2 eyes, 1 excited cat, 0 shore leave at this time of night Tilly, 1 boat able to carry on it’s way tomorrow later today.
no idea!
who cares!