Ages ago Mick spent quite a while trying to find the fuses on Oleanna, fuses between the batteries and … well, everything really! He couldn’t find any. Had they been tucked away well and truly out of sight? It appeared not, he has never found any fuses that the boat builder may (or may not) have fitted. With the new batteries he wanted to rectify this. When he fitted the new batteries last year he fitted a bus bar for the battery cables to terminate on. The bus bar contained fuses to protect the onward cabling to the inverter and the 24v domestic system. The new battery supplier told him that a fuse at the battery end of the positive cables is not required because the battery management system (BMS) would cut off in the event of a short circuit. So it was probably very safe so he didn’t fit any. But it niggled away in his mind. There were various opinions on facebook groups and internet forums, some saying “Oh! You must have fuses” and others saying “You don’t need to bother, nobody has fuses at the battery end” Anyway, due to their relative cheapness and being fairly simple to fit he decided to do it anyway.
So he obtained two “cube” fuse holders from 12 Volt Planet and 2 x 150 amp fuses.
Today he caught the 10am train down to Goole, taking the Brompton with him to avoid having to paddle once reaching the marina. The usual photos of the sea near Bridlington or the Humber and the bridge didn’t get taken due to thick fog, today the world wasn’t picturesque.
In fact the only photo he did take was of the new wee tank connector that Alastair has made for us and left on the stern lockers. Thank goodness, we won’t have to keep our fingers crossed that the connector connects without spillage, or more likely splurtage as the pump pumps!
When Mick had fitted the new fuses and reconnected the batteries the inverter wouldn’t turn back on. About an hours worth of head scratching ensued but eventually he remembered that back in October when we left Oleanna in the Marina he had remotely switched the inverter to “Charger only”. This must have overridden the physical switch on the front of the inverter. This had the effect of not powering up the inverter if the shore power was disconnected (which it was). Anyway, all sorted in the end. Back in the days when Mick worked as a techie in the telecoms and IT sector he had a saying: “Every fault is easy when you know what it is”. Very true in this case.
Meanwhile back in Scarborough one project I’ve been working on has been completed. All three of our garden benches have been repainted and the slats replaced. Not a cheap job but all three have cost us the same as replacing one. Frank leant us his pillar drill and I made sure the new sapele slats got the full number of coats of protective varnish. Hopefully they will now see the two of us out.
Last week I visited a physio for the second time. The wonderful Meera (self referral NHS physio) had given me a few simple stretching exercises and they seemed to have done the job. She believed my muscles were all far too tight and causing me extra problems and exacerbating my knee pain. If only I’d seen her back in August! I have one more exercise to help strengthen my hips and was given an open appointment should I need it before the end of February. No stick needed and I’m increasing the distance I’m walking every day, I’m determined to be able to push lock beams again this year. Thank you Meera!
My next project was to redecorate a room that hasn’t really ever had much thought put to it. The dining room had only ever been painted white and felt a little bit sterile now that we have people staying on that side of the house more often than not. A couple of years ago I made some curtains, last year I added a print out of the swirly wave that I’d used as a front cloth for Rapunzel at Chippy.
Taking colours from the curtains and painting I selected a pale yellow and a turquoise. I’d ordered the paint before Christmas when Dulux were giving 20% off most things, so the colours were a little bit of a surprise when I opened the tins, especially the blue/turquoise.
There are still a few bits to do before it’s fully finished, hopefully before next weekend when our next lodgers arrive.
Yesterday we had a phone call from one of the boat painters on our short list. We’ve not yet managed to visit them. They had had a cancellation for a repaint, sadly someone had passed away, would we be interested in the slot? The slot was in three weeks time. Three weeks at this time of year to get across to the other side of the Pennines, there were bound to be stoppages that we weren’t aware of, tides to consider, weather, possible flooding. Then we’d also need to finish preparing the house for lodgers, leave Tilly with them or heaven forbid she’d have to go into a cattery What’s a CATTERY!?! Best she doesn’t know.
It didn’t take me long to turn down the opportunity, three weeks was just too soon sadly. I hope they managed to find another boat to paint and we’re hoping to be that way in a couple of weeks.
0 locks, 0 miles, 2 fuses, 1 wee connector, 3 benches, 1 possible gardener, 1 hibernating cat, 1 dining room far brighter than before, 1 new painting started but put on hold, 2 knees actually working again, 1 cat prison avoided.