Inverting Again. 11th December

Cropredy Marina to Broadmoor Lock

New berth numbers going up in the marina

Sainsburys took their time in getting back to me yesterday, but this morning I woke to an email and message from them. The Banbury store had not followed the correct process. Anything with the delivery date or following day as Use by dates should have been flagged up on the paperwork. This would have given us the chance to return anything. As it wasn’t mentioned we got our money back for the ham and some humous. So it’s always worth commenting on such things.

Much of the morning was taken up with A Regular Little Houdini conversations. The production manager rang about something else so I got chance to put forward my new idea, then a lengthy chat with the new director. We came up with a solution that once we get to Vienna we may be able to improve on to get the Wow factor. Another chat with the Production Manager and all was agreed.

Festive inflatables

Mick in the mean time readied Oleanna for the off. A final load of washing was done, the dirty washing drawer now empty, again. He topped up with water and flattened down the pram cover.

Then it was time to unplug the hook up. He flicked the switch in the electrics cupboard, but the inverter didn’t come on. This should be seemless, no interruption in power, but the inverter wasn’t working!

Was open inverter surgery required?

He tried all sorts, the big breaker switches were turned off and on, the cover came off, he checked for loose connections, the volt meter came out to check for voltage. He unplugged the cable going to the Victron Monitoring system, the inverter started to work. Plugged it back in, it stopped. It was unplugged again.

Curtain storyboard

By now it was the marinas lunch time so we had lunch ourselves, I finished off a new storyboard all about curtain movements, scanned and emailed it to all concerned in Vienna and Wales. At 13:55 we untied and pushed back, only to come forwards again into the next berth which is a service mooring.

Byebye marina

A top up of diesel and five bags of coal, then we were finally ready for the off. Our plan was not to go far, the stoppage at Claydon flight is only a couple of miles away and due to reopen at the end of play on Friday. So the first available towpath mooring would do us. These however were all taken, so we rose up Broadmoor Lock and found a space there. With only half an hour before cat curfew time Tilly was allowed out to survey our location.

Broadmoor Lock

Mick spent some time on the internet looking for a solution to the inverter problem. He plugged our laptop into it, had a look. The settings seemed fine, so he plugged the monitoring system back in and all was fine. He then altered a setting which means if the inverter is not needed it will turn itself off but will wake up to check if it’s needed at regular intervals, this will save us power.

Some of those red berries would look good on a wreath!

Tomorrow the forecast is for rain much of the day. But if we wake to favourable conditions then we’ll carry on up the last two locks hopefully before it starts to rain. Fingers crossed.

Just what am I meant to do with half an hour?!

1 lock, 0.36 miles, £6.30 refund, 1 reverse, 1 left, 1 fault on the monitoring system, 1 last load, 5 bags coal, 55 litres diesel, 1 very helpful dutch chap, 1 inverter set to turn on and off by itself, 1 problem not solved just gone away, 30 minutes! 1 sock completed, 8m by 3.1m Taft CS Weinrot.

https://goo.gl/maps/2YHBarjQerRcLULA9