Broadford Pipe Bridge ish
No intention of going anywhere today, we relaxed having a cuppa in bed. Our nights sleep had been a touch disturbed. The first train to cross the bridge behind us at around 5am, stirred us from our slumber, they move slowly across the rumbling clanking bridge. It’s not quite as noisy as Vazon Sliding Bridge on the Stainforth and Keadby and has far fewer trains. Then Tilly woke me as her body decided it didn’t want anymore to do with last nights Ding Ding! Unable to bend well I had to enlist Mick in the tidying up aspect. I just pointed and gave Tilly a chin rub before returning to bed.
Our mooring sits pointing north/southwards. So the morning sun sprinkled itself through the trees of the off side of the canal whilst we had breakfast. Day boats from up ahead started to come past mid morning, followed by NB Ella and one or two others brave enough to cruise in the midday sun. We however stayed inside at our shady spot.
Tilly spent all day out and about. Only one woofer to have a go at her today, the rest passed by without noticing her.
Mick caught up with cycling, I put scripts in a folder and then sat out under the canopy of trees in my office for the day. There was Act 2 to re-read of my next show before talking to the writer about it.
On our way down to London I was contacted by Joshua Richards an actor I’ve worked with in the past at Hull Truck, if you watch Emmerdale you may know him as wrestler Bear Wolf! A couple of years ago he directed ‘A Regular Little Houdini’ which won quite a few prizes. He and the actor/writer Daniel Llewelyn-Williams, were approached about remounting the show, expanding it a touch as it had been a one act play along with expanding it visually from a chair and a suitcase to something more.
I got chance to read the script before I decided to do it, which was a first for me. It is a great script, a wonderful story that as I read it conjured up an atmosphere of the docks in Newport Wales in the 1900s.
It has Houdini in the title, the name of our first second mate. So what was not to like, plenty of lead time too and it should fit around Chippy panto and our plans to cruise this summer. Oh and there was one more thing that swung it, it is being produced at the Vienna English Speaking Theatre, in Vienna, in January!
Tilly climbed trees, stuck her arm down holes whilst we prepared a barbecue, my office transforming itself into our leafy terrace for the evening. Only one problem, due to our wonky mooring our table top was being used as a plank to get on and off the boat. We managed in the end and enjoyed sitting out watching all the runners and cyclists sweating their way along the towpath.
0 locks, 0 miles, 1 sickly cat, 31ish degrees C, act 2, 1 writer, 9 hours plus! 1 very exhausted cat, 4 veg kebabs, 2 chunky turkey steaks, 2 cobs of corn, 1 troublesome back, 5 years full time CCing.
Yesterdays Property
https://www.seymours-estates.co.uk/properties/12092475/sales5 bedrooms for £650,000
well done on the Vienna gig! Bit far for Oleanna though Christine