Sykehouse Junction, New Junction Canal to Stubbs Bridge, Aire and Calder Navigation
Shore leave was granted this morning for 90 minutes. 90 BRILLIANT!!! As we finished breakfast Tilly got a call from the hatch, this was shortly followed by me putting on my shoes to do the mad cat woman up and down the towpath. Yesterday we’d been joined by NB Ampere so I even had witnesses to my calling into the friendly cover.

After five minutes or so I thought I heard Tilly’s bell. It gradually worked towards me and she popped out from between the nettles. You said 90! It’s no where near 90 hours yet!! She reluctantly headed towards Oleanna, her moves suggesting that if I didn’t grab hold of her soon then we’d be waiting for quite sometime whilst she decided whether to use shore based facilities or not! Thankfully I managed to pick her up quickly without too much of a Rugby tackle, the onboard facilities used quite promptly and would have ended up being her choice anyway.

I clicked the Nebo link to on and then headed off to walk ahead with the key of power in my pocket. Along the New Junction to the bridge over the Went Aqueduct then along the towpath towards Pollington Lock. Back in December 2020 or January 2021 Mick and I walked the last stretch of this trying to get to see the slipped banking that happened after the big breach on the Aire and Calder. A pleasant walk with only a couple of slight bends, no sign of Oleanna following me though until I’d got quite close to the lock.

Two boats were just coming into the lock, three people wearing life jackets walked from one end of the lock to the other, there were volunteers on duty. The area around the lock always looks smart so I suspect they spend most of their time cutting the grass etc, but today they were being kept busy with boats.

The bywash pushed the exiting boats towards the towpath, not enough umph applied, where as Mick knew what was coming so upped the revs and zoomed through into the lock.
I’d achieved my brisk walking for the day, but was short on steps, however over the last couple of days my right calf has been complaining, I think after trying to open Beal Lock, so I decided that that would be it for today, leaving some stretches of the Aire and Calder yet to be walked.

No volunteers at Whitley Lock, Mick hovered in the lock so the paddle held him to the side, it’s a side filler and if you stay on the left hand side going up it’s easy. On past Eggborough moorings, the same boat still moored here. We are getting to recognise the local boats that nudge up and down the Aire and Calder and wonder if we’ll be considered to be one of them in the coming weeks.

We pulled in a little earlier than we had done the other day, managing to find rods in the chunky armco to use chains to moor up. Tilly was given 4 HOURS shore leave. The roof here was a very good vantage point, but before I could make the most of it I had to make sure everything on the roof was still mine. Strange noises of cat scratching came from the roof as Tilly made sure that pesky grey cat’s scent was eradicated from everything.

Work wise I worked through my annotated script adding my notes to a list, from this I now know where each scene is set, what it requires set pieces wise and whether it is a front cloth scene or full stage scene. Some of the scenes may reuse the setting from an earlier scene, but they also may require different bits and bobs of dressing.

The campaign cruise left West India Dock this morning and most probably split three ways, some back in at Limehouse, others Brentford and the rest up to Teddington to head up stream on the Thames. Petition if you still haven’t signed it.
2 locks, 8.2 miles, 2.98 miles walked, 48 minutes briskly, 2 outsides, 1 cat who only works in hours, 1 mad cat woman, 5 pages notes, 2 scenic breakdown, 1 Mrs Tilly stamp of approval.



We were there!
SAM
‘Red Wharf’
So glad you made it Sam