Two Bricks In The Amber. 26th July

Hunsdon Lock to Broxbourne Bridge

Above Hunsdon Lock

With all the rain yesterday we knew the river would have come up. The small weir that lads had been paddling in on our way upstream the other day was now a torrent of water, not sure you’d have been able to stand up in it today. I looked downstream from the lock the level was certainly higher, would the railway bridge below Roydon be passable?

We dropped down the lock and quite speedily made our way to Roydon Lock. There were quite a few boats moored on the pound. Signs along this stretch suggest you should find alternative moorings as the levels change quickly.

Moored on a dodgy pound

At the lock one bottom gate paddle was half raised, presumably to help lower the pound. There are also sluice gates further upstream that were raised sending water down.

16.5 bricks below the green at 09:13

The gauge below the bridge is quite hard to gauge, unless your boat is lowered to the level below. So we brought Oleanna into the lock and dropped her down. When level with the pound/reach below the top of our horns (highest fixed point on Oleanna) were just about level with the top mortar line of the lock. Tracing this across to the gauge and nudging Oleanna forwards we deemed the river to be two bricks in the amber, ‘Proceed with caution’.

The red line where Oleanna’s horns would come to, 2 bricks into the Amber

Two bricks in the amber was nearer red than green. Two low bridges to go under, which we might just make, but there is also a sharp left hand bend which with the increased flow would make it a touch hard to skid round. If we’d been heading upstream then maybe we’d have given it a go, you can go slowly heading into the current and stop should needs be.

Below the lock, river to the right and river to the left

Mick reversed Oleanna back into the lock, I closed the bottom gates and we refilled the lock, reversed out onto the lock landing, pulling as far back as we could and left the gates open should anyone else arrive from above.

A chap from a boat moored there said the level yesterday had been right up to the top of the lock and spilling over the bottom gates. The lady at the lock cottage said if we had no rain today we should be fine by the end of the day. All we had to do was wait, so that is what we’d do, Tilly taking advantage of the spare hours.

A message came from Hackney that the washing machine circuit board had arrived! Hooray!! With time on our hands Mick headed off to the station to catch a train in to Stratford to collect it.

During the morning I had a quote through for the set build of #unit21. Apparently the cost of materials has shot up in the last few months, I’m not surprised. Grahams quote thus was a touch more than I’d been hoping for. I need to get my budget in to the Producer by the end of the week, so we’ll see what she reckons as I know we’ve already trimmed away quite a lot of what we were wanting.

18.5 bricks at 13:15

At about 1:15pm I could hear a boat arriving. One lock gate was slightly closed so would need opening up for them to enter the lock, so I went to lend a hand. NB Otter had things on it’s roof and the chap on board was aware of the low bridges ahead, but wasn’t aware of how the gauge worked below the lock. By now the 16.5 bricks below the green had increased to 18.5 so at least another 6 inches. Once Otter was lowered, it looked like it would still be in the amber, but nearer the green. The chap dropped his solar panel off it’s chocks, Tidied his roof, removing any plant pots, crossed his fingers and set off.

He didn’t return.

Then emails from the Production Manager of Panto started coming in. At least she was wanting to communicate with me! A quote for the build needed checking through that nothing had been missed, a village hall is being sought for me to paint in the week prior to rehearsals and the final costs of printed cloths were being added into the budget.

Of course poor Mick arrived back as I was working my way through the quote and was told ‘I’m busy!’ ‘No, I need to concentrate’ ‘Shhhh’. Tilly had already retired to the bedroom to keep out of my way.

18.5 bricks still at 14:47

Once work emails were sent, we made ready to push off again. Two C&RT chaps had walked past going to close sluices up stream saying the level was just about back to normal now. Mick removed the black buckets and coal from the roof. Oleanna dropped down in the lock, the level below had risen a touch since NB Otter had gone through. Still in the amber but far closer to the green, we’d go for it.

THE Bridge

Zoomy down the river. Around a bend. There was THE bridge. All looked good several inches to spare. We’d have had difficulty earlier on. Under we limbod out through the other side.

A few inches to spare

The next bridge, arched, was now a breeze. A boat was heading towards us with a raised cratch, we both looked at each other, lined their cratch up with the top of our horns. It would very much be touch and go for them to get under the bridge. We mentioned this to them as they sped past us, at least they’d be able to slow down.

Their cratch a few inches taller than our horns. Eeek!

The sharp turn under the other bridge was handled by Mick and we were safe.

Brick Lock Cottage

Brick lock with it’s leaking top gates took forever to empty, but with patience it did eventually. Below Lower Lock a group of boats has gathered and labelled the off side as Pirate Collective Pollenglish. Back to the junction with the River Lee and the end of the River Stort.

Boats were using the services below the lock, so there was no hoping back onboard below, a little walk was needed to find a suitable spot. Pylons of the Lee now escorted us back to Dobbs Weir Lock where two magnet fishers were hard at work, it didn’t look like they’d caught much.

Fielde’s Weir

At Carthagena Lock a boat was just leaving, the gates left for us. Brilliant! Except there was a breasted up pair hiding amongst the masses waiting to go down. We took our revs off and glided into the side to wait our turn.

Fielde’s Lock, back on the Lee

We helped the pair down. If anyone would like a couple of painted watering cans they have been left for anyone to pick up just by the lock. Mick helped with the annoying bottom gates, thankfully as we left they weren’t too much bother.

Cables are back

Fingers crossed that a mooring would be available at Broxbourne. Most boats want solar for 14 days, so we were lucky in that there was space for us under the trees. We’d also quite like some solar, but cruising for a few hours a day means it’s not as imperative to us.

Watering can anyone?

Too late in the day for Tilly to go out she was plied with her evening dingding to placate her. After we’d eaten our evening dingding Mick pulled the washing machine out to replace the circuit board. Would it work? Only a few more days of pants left in the clean drawer!

Well, we’ll be looking for a laundrette in the next couple of days! Sadly the circuit board hadn’t worked. We will regroup in the morning and decide how to progress.

7 locks, 1 twice, 4.93 miles, 1 left, 2 bricks, 16.5 bricks, 5.5 hours wait, 2 trains, 2 buses, 2 quotes, 1 dog peed rope, 1 bucket water, 1 bollard cat claimed, 18.5 bricks, 1 cratch 2 high, 1 breasted up boats, 2 watering cans, 1 circuit board, 1 broken machine still.

https://goo.gl/maps/NDk3dsBBMDKefRpf8

2 thoughts on “Two Bricks In The Amber. 26th July

Comments are closed.